top of page

Hot Oil Tool

Velocity ALS now provides an innovative new product designed and engineered to make hot oil operations more efficient less costly and far less damaging to formations.


1. Hot oil is pumped down to the depth of the packer and circulated back to the surface. The treating fluid does not go into the formation.


2. A typical hot oil job with the VALS Hot Oil Tool should require only about two hours and will treat much more thoroughly.


3. The well will take far less time to recover.


4. The main purp ose of the Hot Oil Tool is to keep the treating oil hot while it does its’ job and to keep the treating oil from damaging the formation.


  More info contact us   

TREAT MORE EFFECTIVELY, WITH GREATER EFFICIENCY

bottom of page